TitleProduct

HDPE Pipe Welding Equipment

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2021-03-17 11:34

  • Browse the number:

    458

Send an inquiries
+
DSL Fusion Technology Co., Ltd
Contactaixin:

desuili(Mr.)  

Email:

telephone:

phone:

Arrea:

Beijing

Address:

711 NO.4 Building, Shijia Plaza, Xiacheng District, Hangzhou, China.

Website:

http://www.fusionhdpe.com/ http://desuili.gxrsnt.com/

+

Description

The HDPE Pipe Welding Equipment is mainly used for welding HDPE pipes. It consists of a frame, milling cutter, heating plate and attachment bracket. The frame of the machine is made of high-strength aluminum alloy, with a strong structure but lightweight, very durable. This one is a manual type without a hydraulic system. Our equipment specifications are complete and can meet different needs. If you need HDPE Pipe Welding Equipment, you can contact us at any time.


Feature

The HDPE Pipe Welding Equipment provided by our company sells well all over the world with its excellent quality and reasonable price. The main docking pressure of our equipment is provided by hydraulic power source, and the cutting pressure is provided by a three-phase power source, which makes the whole machine run reliably and stably. In addition, its fixture adopts a double ferrule stacking structure, with high docking accuracy and easy adjustment of misalignment amount.


Specification

Product Name

HDPE pipe welding equipment

Product Model

DH160

Input Voltage

220V±10% 50/60Hz

Fuse Range

63-160mm

SDR

SDR9 to SDR41

Heater Temp

0℃~270℃(±7℃)

Applied Material

PE、PP、PVDF

Heater Power

1.0KW

Facer Power

0.71KW

Hydraulic Power

0.75KW

Working pressure

0-6Mpa

international warranty.

12 months

Weight

110kg

ISO21307:2011(E) and DVS2207/1(08/2007)


Product Display



FAQ

Q1:Are you a manufacturer?

A1:Yes, we are manufacturer with 15 years experience, located in Zhejiang China.


Q2:What’s your MOQ?

A2:We do not have MOQ, even 1pcs is acceptable, but different quantities with different prices.


Q3:How long will it take for production?

A3:Depends on the quantity, but normally takes 35-45 days for a 40HQ container.


http://www.fusionhdpe.com/